Our Projects

services-sustainability-and-responsible-investment-solutions.jpg

KOCAELÄ° IHC-O&M ESG SERVICES

Main Client: Gama Türkerler JV & Türkerler Gama JV

Geography: Easten Europe /Turkey

Description:

The project (Kocaeli City Hospital) has a capacity of 1,200 beds and is currently in operation. The Project's existing management plans that was prepared for the contruction period will be updated, and the ESMS will be revised to align with the specific practices and requirements of the operational period. Additionally, the necessary training will be conducted to ensure effective implementation.
 

Service Provided: 

  • Revision of existing E&S plans and Human Resources Management System plan and policies

  • Capacity Building Trainings

  • O&M Reporting Support

  • CTA and O&M Agreement requirements

  • OPIC and DIR Reporting

Kocaeli Integrated Health Campus (City Hospital) PPP Project.jpg

Ä°ZMÄ°R BAYRAKLI IHC-O&M ESG  SERVICES

Main Client: MoH

Geography: Easten Europe /Turkey

Description:

The project (Ä°zmir Bayraklı City Hospital) has a capacity of 2.060 beds and is currently in operation.  The Project's existing management plans that was prepared for the contruction period will be updated, and the ESMS will be revised to align with the specific practices and requirements of the operational period. Additionally, the necessary training will be conducted to ensure effective implementation.

Service Provided: 

  • Revision of existing E&S plans and Human Resources Management System plan and policies

  • Capacity Building Trainings

  • O&M Reporting Support

  • CTA and O&M Agreement requirements

  • OPIC and DIR Reporting

Izmir Bayrakli Integrated Health Campus (City Hospital) PPP Project.jpg

TÜVSÜD (Confidential)

Main Client: TÜVSÜD

Geography: Easten Europe /Turkey

Description:

A Chinese energy firm is evaluating multiple locations for the establishment of a planned chemical plant. They have requested confirmation on whether the investment requirements can be met, both in the current and future periods, through the completion of a comprehensive due diligence survey on natural resource availability and infrastructure capacity.

Service Provided: 

  • Preparation of a pre-findings report and Natural Resource and Infrastructure Capacity Due Diligence Report and site visit to each area

Akyel 2 WPP Extension Project.jpg

ASKI DIGITALIZATION PROJECT

Main Client: ASKÄ°

Geography: Easten Europe /Turkey

Description:

ASKÄ° is need of digitisation technology to effectively improve conditions in the water distribution network by getting the needed data to identify the cause and direct solutions and reduce their Non-Revenue Water (NRW) rate. There are a total of 10 tasks and we will be contributing for two of them. 

Service Provided: 

  • Preparation of Preleminary Impact Assessment Report (Task 7) & Development Impact Assessment Report (Task 8).

no-people-call-center-helpdesk-with-multiple-monitors-office-customer-service-client-suppo

TUARTEK PETKÄ°M Ä°SKELE

Main Client: SOCAR (PETKIM)

Geography: Easten Europe /Turkey

Description:

Main contractor selection tender by the Main Client for an existing jetti project located in AliaÄŸa Ä°zmir with a coverage of renovation and rehabilitation of the jetti with the surrounding facilities and construction of new faciltieis

Service Provided: 

  • Tender assistance, cost consultancy, drafting technical contract for settlement of jv agreement, contract negotiation 

2832020175554430_projeler-devam-eden-projeler-petkim-petrokimya-holding-as-socar--iskele-3

KENT NEW HOSPITAL INVESTMENT
PRE-FEASÄ°BLÄ°TY

Main Client: Ä°stanbul Kent University

Geography: Easten Europe /Turkey

Description:

The Client, Istanbul Kent University, plans to go for a new hospital development investment as a result of its envisaged expansion of medical faculty education as urged by YÖK (High Education Council). The hospital to contain minimum standards of 200 bed capacity and serve as integrated educational service in addition to serve as general hospital. As Infratech, we are assigned to prepare a pre-feasibiity study for the planned investment to support Client's go/no-go decision and structuring healthcare operational needs and financial status of the investment 

Service Provided: 

  • Prpearation of prefeasibility study comprising healthcare needs assesment report, project master plan and financial feasibility study for 200 beds capacity general city hospital for the selected location. 

basaksehir-2852632d9db6150005.72838489.jpg

ESB EXPANSION PROJECT

Main Client: TAV

Geography: Easten Europe /Turkey

Description:

We are giving support to ADL as a subcontractor for the preparation of E&S Monitoring Report

Service Provided: 

  • Preparation of an Environmental and Social Monitoring Report.

no-people-call-center-helpdesk-with-multiple-monitors-office-customer-service-client-suppo

ASO 1 OSB TOIZ Project

Main Client: ASO 1 TOIZ

Geography: Easten Europe /Turkey

Description:

Development of (8.78 MWp) solar panels

Service Provided: 

  • Preparation of ESMP and SEP. An Ex-Post will be prepared if needed.

Two-people-installing-solar-panels-on-roof-1.jpeg

Konya City Hospital HSES and
Labour Audit Project

Main Client: ATM SaÄŸlık Konya Yatırım ve Ä°ÅŸletme Anonim Åžirketi 

Geography: Easten Europe /Turkey

Description:

The project (Konya City Hospital) has a capacity of 1,250 beds and is currently in operation. A three-year retrospective audit covering environmental, social, occupational health and safety (OHS), and business and working conditions will be conducted with third parties under the Corrective Action Plan (CAP) and Environmental and Social Action Plan (ESAP). The project owner will work with various financing institutions. 

Service Provided: 

  • A 3-year retrospective environmental, social, OHS and labour and working conditions audit report.

Konya Karatay Integrated Health Campus (City Hospital) PPP Project.jpg

ASO 2 OSB TOIZ Project

Main Client: ASO 2 OSB TOIZ

Geography: Easten Europe /Turkey

Description:

Development of (8.78 MWp) solar panels

Service Provided: 

  • Preparation of ESMP and SEP. An Ex-Post will be prepared if needed.

Header-Image-by-Zbynek-Burival-Unsplash.jpg

Asım Kibar OSB TOIZ Project

Main Client: Asım Kibar OIZ

Geography: Easten Europe /Turkey

Description:

Construction of a Solar based sludge dewatering facility.

Service Provided: 

  • Preparation of ESMP and SEP

4-28.jpg

UÅŸak OSB TOIZ Project

Main Client: UÅŸak OSB

Geography: Easten Europe /Turkey

Description:

Development of (4,1958 MWm/3,2 MWe) solar panels

Service Provided: 

  • Preparation of ESMP and SEP

464193247_2835092773317391_5951836144603660155_n.jpg

UÅŸak Deri Karma OSB TOIZ Project

Main Client: UÅŸak Deri Karma OIZ

Geography: Easten Europe /Turkey

Description:

Development of the 4.4MWe solar panels

Service Provided: 

  • Preparation of ESMP and SEP

shutterstock_320358338-scaled-1.jpg

DüzbaÄŸ WTP - Labour and Working
Condition Assessment Project

Main Client: Düzbağı WTP

Geography: Easten Europe /Turkey

Description:

The construction of DüzbaÄŸ drinking water treatment plant

Service Provided: 

  • BRD PR2 assessment in the Environmental and Social Assessment report to be prepared within the scope of the loan provided by EBRD for the construction of DüzbaÄŸ drinking water treatment plant

cq5dam.web.1280.1280.jpeg

Demir Export Ä°SPÄ°R

Main Client: Demir Export A.Åž.

Geography: Easten Europe /Turkey

Description:

The project area is undergoing  an enlargement process (40 hectares) due to changes in the equipments. The project area consits of an open pit copper and zinc mine and supporting facilities. There will be no change on the used process and technology.

Service Provided: 

  • Preparation of an ESMP including a site visit and online meeting

ispir1.jpg

Türkiye Earthquake Reconstruction and Recovery Project

Main Client: CE Yönetim Danışmanlık ve Ticaret Limited Åžirketi

Geography: Easten Europe /Turkey

Description:

Reconstruction of the residential structures that were affected by the earthquake disaster. The project area consists of three different rural sections (Groups 1 through 3) of Adıyaman province that were determined by AFAD and is planned to be finished between May 2024 and June 2025 with a total of 192 residential structures.

Service Provided: 

  • ESG Consultancy: The overall task is to carry out three E&S Screenning Forms for each group then continue with the preparation of three Environmental and Social Management Plan (ESMP) and Stakeholder Engagement Plan (SEP) for each group in accordance with the national legislation and World Bank Group Standards (WBG), carry out  Stakeholder Engagement Meetings, establish a grievance redress mechanism within the ESMP report , and provide a training report.

Sapphire-building-in-Istanbul.jpg

Sanko Enerji RSM Project

Main Client: Sanko Enerji A.Åž. 

Geography: Easten Europe /Turkey

Description:

The Environmental and Social Management Framework consists of mitigating, monitoring and institutional measures to be taken during the implementation and operation of a project in order to eliminate, offset or reduce adverse environmental and social risks and impacts to acceptable levels. The Environmental and Social Management Plan (ESMP) will also include the measures and actions required to implement these measures.

Service Provided: 

  • ESG Consultancy: It is the general duty to carry out and report environmental and social monitoring studies in accordance with national legislation, TSKB (Bank) and IFC Performance Standards of the Salihli GPP project, which is in the operation phase within Sanko Enerji A.Åž. (Customer), as well as to carry out and report Stakeholder Engagement Plan studies.

Sanko-Enerji-200-MW-jpg.webp

Gazi WPP Project

Main Client: MoH

Geography: Sanko Enerji A.Åž. & TSKB

Description:

The Gazi-9 Wind Power Plant (WPP) Project has been operated by Sanko Energy, the sole owner of the Project, within the borders of Bayramiç district of Çanakkale Province, since November 2021. The project consists of 14 turbines with a total installed capacity of 51 MWe/ 6712 MWm. Project activities and procedures will be reviewed to assess whether all potential environmental and social impacts, issues and risks have been assessed and mitigated. During the preparation of the monitoring report, national legislation, TSKB Environmental and Social Risk Assessment Process and IFC Performance Standards will be taken into consideration.

Service Provided: 

  • ESG Consultancy: The overall task is to carry out and report environmental and social monitoring studies in accordance with national legislation, TSKB (Bank) and IFC Performance Standards within the scope of the current Environmental and Social Action Plan (ÇSAP) and Environmental and Social Management Plans of the Gazi-9 WPP project, which is in the operating phase within Sanko Enerji A.Åž. (the Customer).

gazi-ruzgar-slider1.webp

Güney WPP Project

Main Client: Sanko Enerji A.Åž. & TSKB

Geography: Easten Europe /Turkey

Description:

Consisting of 14 wind turbines with an installed capacity of 73.6 MWm / 70 MWe (12 x 5.5 MWm / 5.3 MWe and 2 x 318 MWm / 312 MWe), Güney-ı WPP was fully commissioned in September 2021 and is located in Karacabey District of Bursa. Project activities and procedures will be reviewed to assess whether all potential environmental and social impacts, problems and risks have been assessed and mitigated. Implementation gaps and points for improvement will be identified.During the preparation of the monitoring report, national legislation, TSKB Environmental and Social Risk Assessment Process and IFC Performance Standards will be taken into consideration.

Service Provided: 

  • ESG Consultancy: The overall task is to carry out and report environmental and social monitoring studies in accordance with national legislation, TSKB (Bank) and IFC Performance Standards within the scope of the current Environmental and Social Action Plan (ÇSAP) and Environmental and Social Management Plans of the Güney-ı WPP project, which is in the operating phase within Sanko Enerji A.Åž. (Customer).

haziran-2008.png

Tıbah Airport-Medina -ADL

Main Client: Tibah Airports Development Company Limited (SPV)

Geography: Middle East

Description:

The Expansion Project of Madinah Airport. The objective of Phase 2 capex is to increase the airport capacity to 17 million mppa. The duration is expected betw 2024 -  2026.Financial close expected till  2024Q1. 

Service Provided: 

  • Lenders Traffic Advisor (ADL), Lenders Technical Advisor (Infratech): Task 1 – Documents Review:

  • Technical opinion on risk transfer to the EPC JV. 

  • Capex check adapted to the final design and adequacy of the contingencies.  

  • Design review: Adequateness of the selected design (assumptions, innovations, energy efficiency, etc). Expanded technical due diligence.

  • Design review: Check the design according to ICAO classification and IATA expected level of service.    
    Expanded technical due diligence
    Task 2 - Review of construction works: 

  • Review of the timeline/schedule assessing the compatibility with current operations. 

  • Review of quality control program and tests 

  • Review of claims from the contractor and opine. 

  • Review and comments on the contractor’s invoices. 
    Task 3 - Quarterly or semi-annual reporting:

  • Photographic report with comments on physical milestones. 

  • Review and opine on borrower’s and EPC contractor’s reports. 

02_Medina-Airport-exterior-©-Scott-Brownrigg-scaled.jpeg

Sarıyer-Kilyos Tünel Projesi

Main Client:  Ä°ÇTAÅž ALTYAPI YAVUZ SULTAN SELÄ°M KÖPRÜSÜ VE KUZEY ÇEVRE OTOYOLU YATIRIM VE Ä°ÅžLETME A.Åž.

Geography: Easten Europe /Turkey

Description:

The 7.92 km Sarıyer-Kilyos Double Tunnel construction to connect the traffic load between Sarıyer and the Dolmabahçe-Levazım-Armutlu and AyazaÄŸa-Çayırbaşı Tunnels from south to the Northern Marmara Highway and ease down the heavy traffic load. The project serves as the Northern Marmara Highway-Kilyos connection starting at the intersection point at the end of the existing Çayırbaşı-Sarıyer Tunnel and end at Uskumruköy Junction and serve as an outlet for  Northern Marmara Motorway and Istanbul Airport for vehicular traffic in Maslak, Levent, BeÅŸiktaÅŸ, Zincirlikuyu.

Service Provided: 

  • Preparation of SEP, RAP, CCRA, BMP and BAP for Sarıyer - Kilyos Tunnel Project

1kapak1.jpg

Hilal WPP 7MW

Main Client: Sanko Enerji & TKYB

Geography: Easten Europe /Turkey

Description:

Hybrit Wind Farm Project with 7MW installed capacity. Integrated management plans in conformity to AFD and kFw, with prearation of Gender Equality Action plan. 

Service Provided: 

  • Revision of existing E&S plans, development of BMP and Gender Action Plan

2015-ekim.png

Akyel 1-2 WPP Extension Project

Main Client: Sanko Enerji / EIFO

Geography: Easten Europe /Turkey

Description:

Capacity increase project requesting updating of the Environmental and Social Due Diligence Report (ESDD), Environmental and Social Action Plan (ESAP), Environmental and Social Management and Monitoring Plan (ESMMP) and related sub-management plans.Capacity will be increased by adding 4 wind turbines to the project.

Service Provided: 

  • Environmental and Social Due Diligence Report, Environmental and Social Action Plan, Livelihood Recovery Plan ("LRP"), Preparation of Land Acquisition Plan, Cumulative Impact Assessment Report, Stakeholder Engagement Plan, Grievance Mechanism Procedure, Environmental and Social Management and Monitoring Plan, Occupational Health and Safety Management Plan, Traffic Management Plan, Stakeholder Engagement Plan, Waste Management Plan will be revised.

AKYEL1_B.jpg

CMK Kablo Operation Capital Investment Project

Main Client: CMK Kablo Elektrik San.Ä°ç ve Dış Tic.Ltd.Åžti & TürkExim Bank

Geography: Easten Europe /Turkey

Description:

Operation capital investment project for cable production facility.

Service Provided: 

  • Preparation of Environmental and Social Due Diligence (ESDD), Environmental and Social Action Plan (ESAP) and Environmental and Social Monitoring Report (ESMP) in accordance with national legislation, The World Bank Environmental and Social Framework, World Bank Occupational Health and Safety Guidelines, United Nations Guiding Principles on Business and Human Rights and IFC Performance Standards.

CMK Kablo Operation Capital Investment Project.jpeg

ERL Teknik Capital Investment Project

Main Client: ERL Teknik Enerji A.Åž. /TKYB

Geography: Easten Europe /Turkey

Description:

Operation capital investment project for mobile steel structures for solar panels production facility.

Service Provided: 

  • Preparation of the related management plans and monitoring report defined in the Environmental and Social Action Plan (ESAP) in accordance with national legislation, TKYB, IFC PSs, and World Bank ESSs.

fec-erl-proje.jpg

Sersim Operation Capital Investment Project

Main Client: Sersim Dayanıklı Tüketim Malları San. ve Tic. Koll. Åžti /TKY

Geography: Easten Europe /Turkey

Description:

Operation capital investment project for home appliances facility.

Service Provided: 

  • Preparation of the related management plans and monitoring report defined in the Environmental and Social Action Plan (ESAP) in accordance with national legislation, TKYB, IFC PSs, and World Bank ESSs.

Sersim Operation Capital Investment Project.jpg

BEÅžLER Operation Capital Investment Project

Main Client:  BeÅŸler Tekstil Sanayi ve Ticaret A.Åž. /TKYB

Geography: Easten Europe /Turkey

Description:

Operation capital investment project for Ring Yarn Facilities and Glass Fibre Facility.

Service Provided: 

  • Preparation of the related management plans and monitoring report defined in the Environmental and Social Action Plan (ESAP) in accordance with national legislation, TKYB, IFC PSs, and World Bank ESSs.

BeÅŸler Operation Capital Investment Project.jpg

Akınal Operation Capital Investment Project

Main Client: Akınal Sentetik San. Tic. A.Ş. / TKYB

Geography: Easten Europe /Turkey

Description:

Operation capital investment project for the wet laid production line.

Service Provided: 

  • Preparation E&S Monitoring in accordance with national legislation, TKYB, IFC PS, and AIIB Environmental and Social Standards

Akınal Operation Capital Investment Project.jpg

Polibak Operation Capital Investment Project

Main Client: Polibak Plastik A.Åž. / TKYB

Geography: Easten Europe /Turkey

Description:

Operation capital investment project for the plastic film facilities with a production capacity of 180,000 tons of BOPP and 36,000 tons of Metallized BOPP films.

Service Provided: 

  • Preparation of the related management plans and monitoring report defined in the Environmental and Social Action Plan (ESAP) in accordance with national legislation, TKYB, IFC PSs, and World Bank ESSs.

Polibak Operation Capital Investment Project.jpg

Arısu SPP  - 75 MWe

Main Client: Erciyes Anadolu Holding

Geography: Easten Europe /Turkey

Description:

Gün GüneÅŸ Van Arısu SPP, commissioned in 2020, is located in the town of Tusba in Van. There are 138,213 monocrystalline module type solar panels in the power plant, in which Nextracker smart solar tracking technology is used, and the electrical energy produced within the scope of the project is given to the network after the conversion in the inverter.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations

Arısu SPP  - 75 MWe.jpg

Büyükalan 1 SPP - 25 Mwe

Main Client: Erciyes Anadolu Holding

Geography: Easten Europe /Turkey

Description:

Büyükalan 1 SPP,  commissioned in 2021, is located in the district of Akseki in Antalya province. There are 85,512 monocrystalline module type solar panels in the power plant and the electrical energy produced within the scope of the project is given to the network after the conversion in the inverter. Büyükalan 1 SPP produces approximately 51 GWh of energy per year with an installed capacity of 23,4 MWe.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations

Büyükalan 1 SPP - 25 Mwe.png

Salihli Geothermal Power Plant  69,5 Mwe

Main Client: TKYB

Geography: Easten Europe /Turkey

Description:

Advisory during  operating period for Salihli JES Project 

Service Provided: 

  • The overall work is defined as the preparation of reports defined in the Environmental and Social Action Plan (ESAP) currently within Sanko Enerji A.Åž. (Customer) in accordance with national legislation, TKYB (Bank), IFC Performance Standards.

Salihli Geothermal Power Plant  69,5 Mwe.jpg

Atares 1-2 WPP 170 Mwe

Main Client: Ataseven Holding /IFC, EBRD

Geography: Easten Europe /Turkey

Description:

Wind farm of 170 MWe total installed capacity

Service Provided: 

  • Development of Environmental and Social Impact Assessment as per IFC PSs and Equator Principles. Also preparation of a Livelihood Restoration Plan against IFC PS5 and EBRD PR5.

Atares 1-2 WPP 170 Mwe.jpg

Çanta WPP - 50 Mwe

Main Client: Erciyes Anadolu Holding/ RHG Enertürk

Geography: Easten Europe /Turkey

Description:

Çanta WPP, which was commissioned in 2014, is located in Silivri district of Istanbul province. There are 21 turbines in the power plant and the power plant is connected to the electricity network from the transmission level. On the power generation license issued on behalf of RHG Enertürk, 19 turbines of 2.5 MWe each and 2 turbines of 1.25 MWe each were installed. The plant has a total dry capacity of 50 MWe/54.7MWm.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations

Çanta WPP - 50 Mwe.jpg

Ömerli WPP - 100 MWe

Main Client: Erciyes Anadolu Holding/ Betim Energy Investment Production and Trade. Inc

Geography: Easten Europe /Turkey

Description:

 "Ömerli Wind Power Plant" project with 50 turbines and an installed capacity of 100 MWm in Istanbul Province, Silivri District. As a result of the Environmental Impact and Evaluation studies carried out in this direction, the "EIA Positive" decision was made in June 2019.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations

Ömerli WPP - 100 MWe.jpg

Sibel WPP - 90 Mwe

Main Client: Erciyes Anadolu Holding/ Sibelres Elektrik Üretim A.Åž

Geography: Easten Europe /Turkey

Description:

Sibel Wind Power Plant with an installed capacity of 91,875 MWm / 80 MWe (20 x 3,675 MWe + 5 x 1,30 MWe)located in borders of Ä°zmir Province. Currently, 22 wind turbines are installed and an appropriate opinion has been given by EMRA regarding an additional 3 turbines. 

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations

Sibel WPP - 90 Mwe.jpg

Ayrancılar HEPP - 41.454 Mwe

Main Client: Erciyes Anadolu Holding/ RHG Enertürk

Geography: Easten Europe /Turkey

Description:

The project (Kocaeli City Hospital) has a capacity of 1,200 beds and is Muradiye Ayrancılar HEPP, consists of Şelale HEPP and Ayrancılar HEPP and established in 2011, is located in Muradiye district of Van province. The power plant has a total of 17,707 m of water transmission lines and the power plant is connected to the electricity grid from the Ayrancılar Transformer Station (TS) transmission level.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations

Ayrancılar HEPP - 41.454Mwe.jpg

Åželale HEPP - 13,61 Mwe

Main Client: SY Grup

Geography: Easten Europe /Turkey

Description:

Şelale HEPP, established in 2011, is located on Bendimahi Stream in Muradiye district of Van province. Şelale 1 HEPP, together with Ayrancılar HEPP, form the Muradiye Ayrancılar HEPP Project, and Muradiye Ayrancılar HEPP Project has a total of 17,707 m water transmission lines. The power plant is connected to the electricity grid from the Ayrancılar Transformer Station (TS) transmission level.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations

Åželale HEPP - 13,61 Mwe.jpg

Erenköy HEPP - 22.500 Mwe

Main Client: Erciyes Anadolu Holding/ RHG Enertürk

Geography: Easten Europe /Turkey

Description:

Erenköy HEPP,  established in 2010, is located on Murgul Stream in Murgul district of Artvin province. The power plant has a total of 6,787 m of water transmission lines and the power plant is connected to the electricity grid from the distribution level.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations.

Erenköy HEPP - 22.500 Mwe.jpg

Yayla HEPP - 4.670 MWe

Main Client: Erciyes Anadolu Holding/ RHG Enertürk

Geography: Easten Europe /Turkey

Description:

Yayla HEPP, established in 2013, is located on Murgul Stream in Murgul district of Artvin province. The power plant is connected to the electricity grid from the distribution level. Yayla HEPP produces approximately 17 GWh of energy per year with an installed capacity of 4.67 MWe.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations.

Yayla HEPP - 4.670 MWe.jpg

Sümer HEPP - 21.600 Mwe

Main Client: Erciyes Anadolu Holding/ RHG Enertürk

Geography: Easten Europe /Turkey

Description:

Sümer HEPP, established in 2010, is located on Alucra Stream in Åžebinkarahisar district of Giresun province. The power plant has a total of 5,065 m of water transmission lines and the power plant is connected to the electricity grid from the distribution level.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations.

Sümer HEPP - 21.600 Mwe.jpg

Tuna HEPP - 37.190 Mwe

Main Client: SY Grup

Geography: Easten Europe /Turkey

Description:

Tuna HEPP, established in 2012, is located on Delice Stream in ReÅŸadiye district of Tokat province. The power plant has a total of 10,483 m of water transmission lines and the power plant is connected to the electricity grid from the Tuna HEPP Transformer Station (TS) transmission level.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations

Tuna HEPP - 37.190 Mwe.jpg

Umut 1,2 and 3 HEPP - 42.250 Mwe

Main Client: SY Grup

Geography: Easten Europe /Turkey

Description:

Umut Regulator and HEPP, consisting of Umut 3 HEPP commissioned in 2010, Umut 1 HEPP commissioned in 2012 and Umut 2 HEPP commissioned in 2014, are located on KarakuÅŸ Creek in AkkuÅŸ district of Ordu province. The power plant has a total of 25.459 m of water transmission line and the power plant is connected to the electricity network with the Umut HEPP substation.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations

Umut 1,2 and 3 HEPP - 42.250 Mwe.jpg

Yaprak 1 and 2 HEPP - 24.280 Mwe

Main Client: SY Grup

Geography: Easten Europe /Turkey

Description:

Yaprak 1 HEPP, established in 2013, is located on Gökdere Stream in TaÅŸova district of Amasya province. Yaprak 1 HEPP, together with Yaprak 2 HEPP, form the Yaprak HEPP Project, and Yaprak HEPP Project has a total of 15,550 m water transmission lines. The power plant is connected to the electricity grid from the Yaprak HEPP Transformer Station (TS) transmission level.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations.

Yaprak 1 and 2 HEPP - 24.280 Mwe.jpg

BaÅŸak HEPP - 6.850 MWe

Main Client: SY Grup

Geography: Easten Europe /Turkey

Description:

Başak HEPP, established in 2010, is located in Kurulcaşile-Cide districts of Bartın province. The power plant has a total of 1,593 m of water transmission lines and the power plant is connected to the electricity grid from the distribution level. Başak HEPP produces approximately 12 GWh of energy per year with an installed capacity of 6.85 MWe.

Service Provided: 

  • Within the scope of the Technical Due Diligence to be carried out for 17 Power Plants in Turkey, there is a need to determine the Environmental, Health and Safety risks. Accordingly, this EHS Risk Assessment Report has been prepared in order to be reviewed by the appraisers/organizations.

BaÅŸak HEPP - 6.850 MWe.jpg

BYPOL PDH/PP Project

Main Client: Bayegan Dış Ticaret A.Ş.

Geography: Easten Europe /Turkey

Description:

Development of Production plant for production of PP from propane at 490 ton/year.

Service Provided: 

  • ESG Consultancy 

BYPOL PDH-PP Project - (Generic Photo).jpg

Almaty - Asfendyarov Hospital PPP

Main Client: EBRD, MoH Kazakhistan?

Geography: CIS/Kazakhstan

Description:

DBFOM of Asfendyarov Hospital (400 beds).

Service Provided: 

  • Healthcare Services:
    Concept design development and a feasibility study design sections in support of the Transaction Advisory further for EBRD PPF.
    Designed and developed the healthcare services, medical technology and equipment as well as fixed furniture (FF&E)
    PPP structuring and tender preparation
    Review of available projct information and past structuring attemps
    assistance during the tender; and assistance during commercial and financial close 

  • Operations & Maintenance and service specifications developmen

  • Project Delivery and Strategy

  • Developed the tender documents including the technical annexes (which includes engineering   designs, medical services and equipment with high-end technological solutions), 

  • ESG Services:
    Environmental & Social assessment, Environmental and Social Assessment (Environmental and Social Due Diligence - ESDD) of the Project, against the 2019 EBRD Environmental and Social Policy (“ESP”) and associated performance requirements (“PRs”), to identify its environmental and social risks, impacts and benefits and to structure the Project to comply with the ESP and PRs. Preparation of SEP, NTS and a suite of Management Plans together with ESAP. 

Almaty - Asfendyarov Hospital PPP.jpg

Brasov Regional Emergency Hospital PPP

Main Client: EBRD, MoH Romania?

Geography: Europe/Romania

Description:

850-bed Regional Emergency Hospital to be delivered as DBFMO, 160,000m2 GFA, 
3 years construction, 25 years operation and maintenance.

Service Provided: 

  • Healthcare Services:
    Concept design development and a feasibility study design sections in support of the Transaction Advisory further for EBRD PPF.
    Designed and developed the healthcare services, medical technology and equipment as well as fixed furniture (FF&E)
    Operations & Maintenance and service specifications development

  • Project Delivery and Strategy:
    Developed the tender documents including the technical annexes (which includes engineering   designs, medical services and equipment with high-end technological solutions), 

  • ESG Services:
    Environmental & Social assessment, Environmental and Social Assessment (Environmental and Social Due Diligence - ESDD) of the Project, against the 2019 EBRD Environmental and Social Policy (“ESP”) and associated performance requirements (“PRs”), to identify its environmental and social risks, impacts and benefits and to structure the Project to comply with the ESP and PRs. Preparation of SEP, NTS and a suite of Management Plans together with ESAP.  

Brasov Regional Emergency Hospital PPP.jpg

Koksheatau Hospital PPP - Biodiversity Management Plan (BMP)

Main Client: Ronesans Holding RENEL LTD, KZ

Geography: CIS/Kazakhstan

Description:

Multidisciplinary Hospital for 630 beds in Kokshetau developed through a DBFMO setting.

Service Provided: 

  • Desktop Study for Biodiversity Baseline Assessment, Site visit to the Project site for Biodiversity Baseline Assessment, Preparation of a Biodiversity Management Plan and Biodiversity Assessment  Report defining mitigation measures in accordance with IFC PS6.

Koksheatau Hospital PPP - Gender Action Plan (GAP).jpg

Koksheatau Hospital PPP - Gender Action Plan (GAP)

Main Client: Ronesans Holding
RENEL LTD, K

Geography: CIS/Kazakhstan

Description:

Multidisciplinary Hospital for 630 beds in Kokshetau developed through a DBFMO setting.

Service Provided: 

  • Studying the situational economic assessment for gender aspects (Desk Review)

  • Collecting existing qualitative and quantitative data on the gender environment, particularly 

  • Preparation of the Gender Action Plan with a situational economic assessment identifying the mitigation measures in line with IFC PS2 and PS4.

Koksheatau Hospital PPP - Biodiversity.jpg

Lamar Prebid KSA Education

Main Client: KSA PPP Authority, Schools

Geography: Middle East/KSA

Description:

Preparation and assistance in bid proposal Educational public development tender in PPP scheme .

Service Provided: 

  • Preparation of bid and assistance during contract for a PPP tender.

Upcoming-2.webp

Saudi Aramco Tanajeeb Camp Expansion 

Main Client: El Seif O&M Co

Geography: Easten Europe /Turkey

Description:

300,000 sqm of staff camp expansion project delivered through a DBFMO model in Tanajeeb, KSA.

Service Provided: 

  • Concept Design review, life cycle modelling and technical program delivery pre-bid consultancy.

Tail Gas Treatment Project - Saudi Aramco.jpg

Turkestan PPP Hospital

Main Client: YDA

Geography: CIS/Kazakhstan

Description:

The Project is proposed to be delivered through the PPP model for the city of Turkestan in the Turkestan region of South Kazakhstan. Project development started in June 2019, and the scheme includes the design, build, finance, maintain and operate (DBFMO) of a multidisciplinary hospital. The hospital shall have an estimated Gross Floor Area (“GFA”) of 86.000 m2 developed on 160.000 m2 of greenfield land.

Service Provided: 

  • Preparation of the Zero Report including: 

  • Healthcare Services

  • Design Review

  • Medical Planning and Technology Review

  • Project Delivery and Strategy,

  • Local support to construction monitoring and local regulatory compliance reviews

  • ESG Services

  • Local support to ESDD

Turkestan PPP Hospital.jpg

Almaty International Airport (ALA)

Main Client: TAV Airports Holding Co. VPE Capital Ltd. EBRD, IFC

Geography: Easten Europe /Turkey

Description:

A new terminal building located to the north-east of the existing terminal buildings to be developed and it will be extending into the current airport apron. This new terminal will handle the international flights from the airport. The new terminal will accommodate an estimated six million passengers per year, with a total floor area of approximately 50,000 m².

Service Provided: 

  • External Labor Audit to EBRD PR2 and IFC PS2.

Almaty International Airport (ALA).jpg

Antalya Airport Expansion Project

Main Client: TAV/Fraport  JV Banks/ Lenders

Geography: Europe/Turkey

Description:

DBFMO of Antalya Airport Project.

Service Provided: 

  • Project Delivery and Strategy:
    Local support to construction monitoring and local regulatory compliance reviews

  • Construction monitoring support and progress payment evaluations
    QA/QC, HSE and T&C monitoring

Antalya Airport Project.jpg

Çukurova Airport Project

Main Client: Favori Airport - DHMÄ° - Ziraat Bank

Geography: Easten Europe /Turkey

Description:

DBFMO of Cukurova International Airport PPP Scheme Project, EPC Support & SPV Advisory Services
200 ha area, 21 separate building units incl main terminal, carparks, VIP, cargo, Transformators and utility houses, terminals, general aviation terminal, entrance units, fire fighting, security buildings 
The project has been started first in 2010 as a conventioanl tender, but the selected contractor couldnt complete the work and the project had stopped. Then at 2020, DHMÄ°, the tendering authority also the operator opened a new tender under a PPP scheme. Favori is awarded as the SPV with 3 years investment+ 25 years operating rights. 
The foundations which was formerly built by the former contractor is used and new design is developed above those foundations. Steel arcs are used for the main terminal. 2 runways with 60 m lenght.

Service Provided: 

  • SPV advisory, organizational strengthening (SPV level), recruitment support.

  • Project Management, 

  • Project Controls, 

  • Contract Management

  • Contracts and claims advisory

  • Procurement support

  • Project Close Out Support 

Çukurova Airport Project.jpg

Big Almaty Ring Road, Almaty, Kazakhstan (BAKAD)

Main Client: EBRD/ Alsim Alarko+Makyol+SK Eng

Geography: Easten Europe /Turkey

Description:

66km of a ring road to be delivered as DBFMO, 51.5 km long six-lane section and a 14.5 km long four-lane section, eight junctions, 21 bridges, 18 viaducts and one railway truss, 20-years availability-based concession agreement, 3 years construction, 25 years operation and maintenance.

Service Provided: 

  • External Labor Audit to EBRD PR2.

Big Almaty Ring Road, Almaty, Kazakhstan (BAKAD).jpg

NakkaÅŸ-BaÅŸakÅŸehir Motorway Project

Main Client: Rönesans-Meridiamm/ EBRD

Geography: Easten Europe /Turkey

Description:

NakkaÅŸ – BaÅŸakÅŸehir Motorway is the eighth section of the Northern Marmara Motorway system on the European side of Ä°stanbul and is 23.7 km in length as the Main Road and 45 km in total length with the Connection Roads. The concession period is expected to consist of a fixed construction and operation term of 20 years. The construction has been ongoing since 2019 by the EPC Contractor and its subcontractors.

Service Provided: 

  • Climate Resilience Assessment

NakkaÅŸ-BaÅŸakÅŸehir Motorway Project.jpg

North Marmara Motorway Project

Main Client: Marmara Otoyolu Ortak GiriÅŸim (MOJV), 
Ticari Bankalar (Garanti BBVA, Ä°ÅŸ Bank, ICBC)

Geography: Easten Europe /Turkey

Description:

General Directorate of Highways (“KGM” or “the Administration”), has tendered for contracts in May 2016 for the overall North Marmara Motorway Project (including European and Asian sections), which starts at Kinali toll plaza near Alipasa neighborhood in Silivri district of Istanbul province, crosses the city of Kocaeli and ends at Akyazi Trans European Motorway (TEM) toll plaza in Akyazi district of Sakarya province, where the sea crossing is provided by the existing Yavuz Sultan Selim (Istanbul’s Third Bosphorus) Bridge and its associated motorways that are operational since August 2016.

Service Provided: 

  • Preparation environmental and social related management plans in line with the ISO and IFC requirements, Biodiversity and E&S Monitoring.

North Marmara Motorway Project.jpg

Eurasia Tunnel Project

Main Client: Eurasia Tunnel Administration

Geography: Easten Europe /Turkey

Description:

Major transportation project secondary market transaction.

Service Provided: 

  • Preparation of Traffic, Environmental and Social Due Diligence

Eurasia Tunnel Project.jpg

Odayeri-PaÅŸakoy Section of Northern Marmara Motorway 
(including Third Bosphorus Bridge/Yavuz Sultan Selim Bridge)

Main Client: ICA

Geography: Easten Europe /Turkey

Description:

DBFOM of 115km motorway and connection roads between Odayeri-Pasakoy sections and Third Bosporus Bridge/Yavuz Sultan Selim Suspension Bridge (8 lanes of motorway, 2 lanes of railway, 59m of width, 1,408 meters of main span, 322 meters of height), 10 years.

Service Provided: 

  • Preparation of Traffic, Environmental and Social Due Diligence

Odayeri-PaÅŸakoy Section of Northern Marmara Motorway.jpg

Gebze-Izmir Motorway, Turkey
(IFC and EP III)

Main Client: IFC / OIAÅž

Geography: Easten Europe /Turkey

Description:

DBFOM of 400km motorway and connection roads between Gebze and Izmir and Orhan Gazi Suspension Bridge (8 lanes of motorway.

Service Provided: 

  • Preparation of Traffic, Environmental and Social Due Diligence in support of Secondary Market Transaction due diligence for the buy-side entity

Gebze-Izmir Motorway, Turkey (IFC and (IFC and EP III).jpg

Tail Gas Treatment Project - Saudi Aramco

Main Client: Lamar Holding

Geography: Middle East/KSA

Description:

Saudi Aramco is planning to embark on the upgrade of thirty (30) Sulfur Recovery Units (SRU) installed across seven of its operating Gas Plants in order to meet the new SO2 and Air Quality emission targets with a maximum SO2 content out of the tail gas treatment process not exceeding 250 ppmv at zero percent oxygen on dry basis as stipulated by the Ministry of Environment, Water and Agriculture (MEWA). Saudi Aramco is committed to meet these stationary and ambient emission targets by December 2026.

Service Provided: 

  • Pre-Bid Due Diligence and Bid Management
    In particular, our scope focused on a technical review of the developed and proposed mitigation strategies to technical risks on the following main headings:
    •    Consortium Capacity
    •    Delivery Approach (CAPEX and Schedule) 
    •    Technical/Design Compliance  
    •    Operations and Maintenance Approach (OPEX and Planning)
    •    Business Plan Inputs Review